After this challenge was handled for the City of Kingston, the Gantry Crane was re-purposed to service equipment in other parts of the plant.

The Client

City of Kingston

Project Requirements

Valves in Gas-Monitoring Stations needed to be moved.

The Challenge

The valves were up against the walls.

The Solution

An eme Cantilever Package was used on an eme 4400M portable, aluminum Gantry Crane.

This consisted of a specially drilled-and-marked 8-ft. Beam, with the overhanging Cantilever section rated at only 900 lbs.

Ten 26 lb. weights were also supplied, which were placed on a removable cross-brace. This allowed the valves to be removed.